MA APLD: Applied Digital (NASDAQ: APLD)

2026-11-25 · By Moses · APLD

Machine Analyse | Shareable edition | Written 25 Nov 2026

Get the full MA framework: anixinyang.gumroad.com/l/theMAframework

Price reference: $12.22 close on 24 Nov 2026; about $11.60 pre-market on 25 Nov (single source, unverified). 52-week range $11.31 to $50.73. Market cap about $3.7B on about 302M to 305M shares.

Data rule: every price and figure below is dated and no more than one week old unless marked "(dated)". Quarterly figures come from the fiscal Q1 2027 results released 7 Oct 2026 (quarter ended 31 Aug 2026) and are marked as such.


Section 0: Conviction summary

  • Rating: SPECULATIVE BUY
  • Conviction: 5.0/10 (Low tier). The contracted backlog is real and growing, but almost none of it is live yet, the company carries about $6.4B of debt, and it still has to finance roughly the next two years of construction. The stock reacts to every financing headline.
  • Decision: BUY in small tranches only. Size for a stock that can move 20% or more in a day (beta about 5.6 per one source).
  • Risk thesis: over the next 6 to 12 months APLD re-rates or breaks on one question: can it close project financing on Delta Forge 1 and Polaris Forge 3 (planned for Q1 2027) at sensible terms without heavy equity dilution, while taking live capacity from 250 MW towards 600 MW or more? Yes, and the backlog starts converting to rent. No, and the debt and dilution overwhelm the contracts.

Section 1: Company snapshot

  • Builds and operates high-density data centres ("AI factories") for AI and high-performance computing. It signs long take-or-pay leases with large tenants and builds the campuses for them. Campuses: Polaris Forge 1 and 2 (North Dakota), Polaris Forge 3, Delta Forge 1 and 2 (Louisiana) and an Alabama site.
  • Fiscal Q1 2027 (quarter ended 31 Aug 2026, reported 7 Oct):
    • Revenue $341.9M, up 322% year on year. Of this, $183.5M was tenant fit-out services (pass-through construction work) and only $65.8M was base rent.
    • Adjusted revenue $300.4M. Adjusted EBITDA $64.4M (against $0.5M a year earlier). Net operating income $58.8M, an 89% margin.
    • GAAP net loss from continuing operations $221.0M, or $0.76 a share. Adjusted net loss was only $4.1M.
    • SG&A $114.7M, up from $29.5M. Interest expense $77.4M. Capex $2.07B in the quarter. Operating cash flow $63.9M.
  • Balance sheet (31 Aug): cash, equivalents and restricted cash about $3.7B (about $2.95B unrestricted). Total debt about $6.4B. About $2.0B of redeemable non-controlling interest sits outside equity.
  • Capacity: about 1.41 GW leased at the October report, about 250 MW live (all at Polaris Forge 1, leased to CoreWeave). Management targets about 300 MW live across North Dakota by the end of 2026. None of the capacity leased to hyperscalers was live at the October report.
  • Backlog: contracted base-term lease revenue now above $41B (about $100B with all renewal options), over 1.6 GW of contracted critical IT load, about 75% from investment-grade tenants.
  • Latest news:
    • 23 Nov: a new 18-year, 150 MW lease with an unnamed tier-one investment-grade hyperscaler. $5.4B of base-term revenue ($12.7B over 33 years with renewals). Delivery expected in the first half of 2028. Stock rose about 23% to 26% that day.
    • 24 Nov: an 8-K raised the B. Riley preferred-equity commitment from $2.0B to $2.5B, with $1.035B undrawn. The same filing details a $300M bridge loan for Delta Forge 1.
    • 24 to 25 Nov: the stock gave back the lease pop, closing $12.22 on 24 Nov. Morgan Stanley (Equal Weight) cut its target from $41 to $25; Roth cut from $35 to $28.
  • Stock context: down about 33% in a month and about 75% below its $50.73 high. Sector peers also sold off: IREN is down about 48% over the month and CoreWeave about 22% (24/7 Wall St., 24 Nov).

Section 2: Bull case (probability and horizon)

  1. Pricing is rising on new leases. The 23 Nov lease works out at about $2.0M per MW per year, roughly 21% above the June Delta Forge 2 lease (about $1.65M per MW). Needham also puts it near $2M per MW. Probability MED-HIGH (60 to 75%) that the next leases hold or improve on this. Horizon: 2027.
  2. Contracted backlog is large and investment-grade. Over $41B of base-term revenue, up from about $23B in April 2026 and about $36B at the October report. Against a market cap near $3.7B, the equity is small next to the contracts. Probability HIGH (over 70%) that the backlog is real; the open question is financing and delivery, not demand.
  3. Live capacity steps up fast. Management expects over 600 MW placed into service over the next 12 months, against 250 MW over the previous 12 (as reported by 24/7 Wall St.). Polaris Forge 2's first 25 MW hall is reported ready for service. Probability MED-HIGH (60 to 75%) of reaching the 300 MW year-end target; MED (30 to 70%) for the 12-month 600 MW goal. Horizon: Dec 2026 to Nov 2027.
  4. Rent turns the earnings picture. Today base rent is only about 19% of revenue. As Polaris Forge 2 and the Delta and Alabama sites go live (Louisiana and Alabama revenue expected from the first half of 2027), recurring rent replaces one-off fit-out income and the 89% NOI margin applies to far more megawatts. Probability MED-HIGH (60 to 75%). Horizon: 2027.
  5. Financing windows are lined up. Company-stated plan: project financing for Delta Forge 1 and Polaris Forge 3 in Q1 2027 and Delta Forge 2 in Q2 2027, plus a $5B programmatic equity partnership with Macquarie Asset Management and the $2.5B B. Riley preferred facility. A $1.59B 7.000% senior secured note due 2031 already funded the third 150 MW Polaris Forge 1 building. Probability MED (30 to 70%) that each closes on schedule.
  6. Power optionality. Access to up to about 1 GW of potential power in Finland and a power purchase agreement for about 1,200 MW of gas generation in North Dakota (APLD holds about 10% of the supplier, Base Electron). Both are early; they extend the pipeline rather than change the 12-month picture. Probability LOW-MED (under 35%) of material revenue impact by end of 2027.

Section 3: Bear case (probability and horizon)

  1. Funding gap. Debt is about $6.4B and quarterly capex was $2.07B. A 2 Nov headline (secondary source, unverified) quoted the CEO saying 800 MW of planned capacity still needs financing. If the Q1 2027 project financings slip or price badly, the build slows or is paid for with equity. Probability MED (30 to 70%) that at least one financing slips past its target quarter.
  2. Dilution. The B. Riley commitment rise to $2.5B and the $5B Macquarie partnership both fund the build with equity-linked capital. The filings summarised did not state conversion terms or share counts, so the dilution per share is UNVERIFIED. Probability HIGH (over 70%) of meaningful further equity issuance before cash flow covers the build.
  3. Interest bill exceeds base rent. Q1 interest expense was $77.4M against base rent of $65.8M. Interest paid in cash in the quarter was reported at $242.9M, which the release did not explain. The 7% notes and the bridge loan (SOFR plus 300 bps, 364 days) keep this high until rent scales. Probability HIGH (over 70%) that GAAP losses continue through at least fiscal 2027.
  4. Delivery risk. The 10-K describes delivery timing as subject to construction, permitting, interconnection and other risks. The 23 Nov lease does not start until the first half of 2028, so there is no rent from it for at least 18 months. Delta Forge 1 draws on the bridge loan depend on regulatory approvals, including state approval of electricity rates. Probability MED (30 to 70%) of at least one meaningful campus delay. Morgan Stanley cut its target citing long lead times and construction risk.
  5. Earnings quality. About 54% of Q1 revenue was tenant fit-out services, which lasts only while campuses are being built. GAAP loss includes about $60.9M of fair-value losses (mostly on Babcock & Wilcox securities), about $59.4M of stock-based compensation, and about $53M of minority and preferred items (per Stock Titan's reconciliation). Probability MED (30 to 70%) that GAAP results stay noisy through 2027.
  6. Tenant concentration and secrecy. CoreWeave leases Polaris Forge 1 (400 MW per one source) and a single unnamed tier-one hyperscaler accounts for about 57% of leased megawatts. The 23 Nov tenant is also unnamed, so its AI spending cannot be checked directly. Neocloud stress hits APLD even though its hyperscaler leases are separate. Probability MED (30 to 70%).
  7. Sector and macro pressure. AI-infrastructure stocks sold off sharply in November (IREN, Core Scientific, Cipher and CoreWeave all fell this week or month). One contributor-written piece (TradingNEWS, 23 Nov, UNVERIFIED) cited a 10-year yield near 4.94% and a high market-implied chance of a December Fed hike; higher rates raise the cost of APLD's floating-rate bridge debt and the discount on long-dated contracts. Probability MED (30 to 70%) that pressure continues into Q1 2027.
  8. Technicals. Closed $12.22 on 24 Nov, just above the 52-week low ($11.31 intraday). A break below $11.31 opens a gap with no nearby support. Resistance: about $14.68 to $14.90 (18 Nov high), then $16 and $18. A single-source technical read, treat with care.

Section 4: Valuation metrics (at about $12; $11.60 pre-market in brackets)

  • Shares about 302M to 305M. Market cap about $3.7B (about $3.5B at $11.60).
  • Enterprise value, my arithmetic: market cap about $3.7B + debt $6.4B + non-controlling interest about $2.0B − cash about $3.7B (including restricted) = about $8.4B (about $9.2B if only the $2.95B unrestricted cash is counted). Figures are from the 31 Aug balance sheet and predate the latest bridge and preferred draws.
  • Annualised adjusted EBITDA (Q1 $64.4M x 4): about $258M, so EV / run-rate adjusted EBITDA is roughly 32x to 36x (my arithmetic). This is a development-stage multiple, not a mature one, because most contracted megawatts are not yet earning.
  • Market cap / contracted base-term revenue: about 0.09x ($3.7B / $41B). EV / contracted base-term revenue: about 0.2x. These show the size of the contracts against the equity, not profit.
  • GAAP: net loss, no meaningful P/E. Trailing twelve-month EPS about -$1.63 (TradingNEWS).
  • Street (dated): Morgan Stanley Equal Weight, $25 (cut from $41, 25 Nov). Roth $28 (cut from $35). Needham Buy, $70 (cut 8 Oct). JonesTrading Buy, $70. TipRanks average about $47 (stale, pre-dates the cuts).

Scenario table (my model, 12-month view to Nov 2027; analytical estimates, not consensus; low confidence because the outcome depends on financing terms I cannot see):

Scenario Probability What happens Value per share
Bull 25% Project financings close in Q1-Q2 2027 on good terms, 600 MW live by late 2027, one more large lease signed, market pays for backlog conversion about $28
Base 45% Financings close but later and with moderate dilution, about 450 MW live by late 2027, losses persist about $15
Bear 30% Financing slips or is heavily dilutive, delivery delays, sector stays weak about $6
  • Probability-weighted value about $15.5, roughly +30% against about $12. Bull-case upside is about +135% and bear-case downside about -50%. The skew looks positive, but the range is wide and the inputs are soft, so this is a high-variance bet, not a value stock.

Section 5: Financial health

  • Liquidity: about $3.7B of cash including restricted, about $2.95B unrestricted, plus $1.035B undrawn on the B. Riley preferred facility. Most of the cash is earmarked for construction.
  • Leverage: about $6.4B of debt and about $2.0B of redeemable non-controlling interest. Net debt about $3.4B on unrestricted cash.
  • Cost of capital: 7.000% senior secured notes due 2031 ($1.59B); $300M bridge at SOFR plus 300 bps (about 7% all-in per one source), 364-day maturity, prepayable without premium; a subsidiary preferred structure carrying 12.75% that can step up in 2030 and 2031 if units stay outstanding (Stock Titan).
  • Profitability: adjusted EBITDA positive ($64.4M in Q1) but GAAP loss large ($221.0M from continuing operations). Selling and admin costs rose 289% year on year.
  • Cash flow: operating cash flow $63.9M in Q1, helped by working capital; capex $2.07B. The business is funded by financing, not by its own cash flow.
  • Grade: B (contract quality), C (liquidity versus build needs), D+ (earnings quality and GAAP profitability).

Section 6: Catalysts (dated; each tagged with its source)

  1. Dec 2026: 300 MW live target. Company target of about 300 MW across North Dakota by end of calendar 2026 (Q1 FY27 release, 7 Oct, primary). Polaris Forge 2 first 25 MW hall reported ready (Finexus, 25 Nov). Probability MED-HIGH (60 to 75%).
  2. Q1 2027: project financing for Delta Forge 1 and Polaris Forge 3. Company-stated plan (via Finwire, 23 Nov). This is the biggest single swing factor. Probability MED (30 to 70%) on time and on acceptable terms.
  3. About 6 Jan 2027: fiscal Q2 results (estimated, UNVERIFIED; company has not confirmed). The key test is whether base rent grows and how SG&A and interest behave. Probability that base rent rises quarter on quarter: HIGH (over 70%).
  4. Q2 2027: Delta Forge 2 project financing (company-stated plan, via Finwire, 23 Nov). Probability MED (30 to 70%).
  5. First half 2027: Louisiana and Alabama revenue begins (24/7 Wall St., 24 Nov, secondary). Probability MED (30 to 70%).
  6. Ongoing: new hyperscaler leases. Three 15-year take-or-pay leases were disclosed on 27 Jul (dated, secondary), Delta Forge 2 in June (dated, primary) and the 150 MW lease on 23 Nov. Probability MED (30 to 70%) of another large lease inside six months.
  7. Delta Forge 1 bridge draw conditions. Draws depend on construction milestones, regulatory approvals including state approval of electricity rates, lender consents and covenants (8-K, 24 Nov, via a third-party summary; verify in the filing, accession 0001493152-26-054002).
  8. First half 2028: delivery of the 23 Nov 150 MW lease (company release, via TipRanks and Finwire). Long-dated; relevant for the thesis, not for the next two quarters.

Section 7: Competitive position

  • Focuses on purpose-built, high-density campuses for AI and high-performance computing leased long-term to the largest buyers, rather than selling compute itself. This keeps its business model closer to a developer and landlord than a GPU cloud.
  • Peers often compared: CoreWeave, IREN, Core Scientific, Cipher Digital, Nebius (compute providers) and traditional data-centre landlords. Several peers sold off hard in November; APLD's sector exposure is the same even though its contracts are leases.
  • Moat: secured power and sites, long take-or-pay contracts with investment-grade tenants, and construction experience at scale. Weak spots: heavy dependence on a few tenants, unnamed counterparties, floating-rate and short-dated construction debt, and execution on many campuses at once.

Section 8: Macro and sector risks

  • AI-infrastructure sentiment can swing the stock far more than its fundamentals do in any given week. Probability of continued pressure over 1 to 3 months: MED.
  • Interest rates: higher rates raise the cost of floating-rate bridge debt and weigh on long-duration assets. One unverified source cited a high chance of a Fed rate hike on 9 Dec; check this independently.
  • Hyperscaler capital spending: if AI spending slows, new lease signings and the pace of delivery could slow.
  • Credit markets: project financings depend on lenders being willing to fund 2028 deliveries at acceptable spreads.
  • Power and permitting: interconnection and regulatory approvals can delay delivery on any campus.

Section 9: Decision plan

Action: BUY in 3 tranches (speculative).

  • Tranche 1 (one third): $11 to $13 (near the 52-week low). Accept the risk of a further drop.
  • Tranche 2 (one third): on proof, not price: a project financing closes for Delta Forge 1 or Polaris Forge 3 on stated terms, or live capacity is confirmed at or above 300 MW. Acceptable up to about $18.
  • Tranche 3 (one third): after the fiscal Q2 print if base rent is rising and SG&A is under control. Acceptable up to about $20.

Sizing guide: treat as a very high-volatility position. Keep it small enough that a 50% fall does not matter to your overall plan, and count it with other AI-infrastructure names as one sector limit.

Trim: take 25 to 30% off near $28 (bull-case value), or if the stock re-rates above $25 before financings close.

Thesis-break triggers (reduce or exit):

  • (a) a Q1 2027 project financing fails or is priced well above 7% with large equity attached
  • (b) live capacity falls short of about 300 MW by early 2027 without a clear reason
  • (c) a hyperscaler lease is delayed, reduced or cancelled
  • (d) a new equity raise at a deep discount that adds materially to the share count
  • (e) base rent fails to grow in the fiscal Q2 report
  • (f) a close below the $11.31 52-week low with no financing news

Horizon: 6 to 12 months. Review at the early-January results and at each financing close.


Section 10: Quick reference card

  • Ticker: APLD | Rating: SPECULATIVE BUY | Conviction: 5.0/10 | Price: about $12 (24 Nov close $12.22)
  • Backlog: above $41B base-term, about $100B with renewals | Live: about 250 MW (target about 300 MW by end 2026) | Debt: about $6.4B | Cash: about $3.7B
  • Scenario values: Bull about $28 | Base about $15 | Bear about $6 | Probability-weighted about $15.5
  • Next 3 dates: Dec 2026 (300 MW target) | about 6 Jan 2027 (fiscal Q2 results, estimated) | Q1 2027 (project financings)
  • Biggest upside driver: financings close on sensible terms while live capacity and base rent ramp. Biggest downside driver: a financing slip or heavy equity dilution while about $6.4B of debt and a 7% cost of capital weigh on a stock with a very high beta.

Sources (dated)

Applied Digital fiscal Q1 2027 results release (7 Oct 2026, company investor relations); Applied Digital 8-K and press release of the 23 Nov lease and 24 Nov financing letter agreement (filed 24 Nov 2026, via a third-party filing summary on wiseek.ai; verify in the filing); TipRanks (23 Nov 2026) and TradingNEWS (23 Nov 2026) for lease terms, price levels and backlog; Finwire (23 Nov 2026) for the funding plan and financing timeline; Finexus (25 Nov 2026) for the pre-market move, the Morgan Stanley and Roth target cuts and the estimated results date; 24/7 Wall St. (24 Nov 2026) for the month's price action, peer moves, Needham and JonesTrading targets and operating targets; Stock Titan (Oct 2026) for the live-versus-leased capacity breakdown and the GAAP reconciliation. Items flagged "dated" are older than a week.

Figures are as reported by those sources and were not independently audited. Rolled-up figures marked "my arithmetic", the scenario table, probabilities and the rating are analytical estimates. Several sources are secondary or contributor-written; key terms should be checked against the primary filings.

This is not financial advice. Do your own research and size positions for your own risk tolerance. Capital is at risk.


Framework: MA (Machine Analyse), created by Moses (@theMAframework on X) Get the framework: anixinyang.gumroad.com/l/theMAframework

Educational content only. Not investment advice. Capital is at risk.

Get the next one in your inbox

Free market notes and MA framework analysis from Moses. No spam, unsubscribe any time. Or grab the free Lite edition of the framework.